top of page

REBUILDING THE MINI LIBRARY

PHASE 1
Screenshot_20190627-230537_Instagram.jpg

The first phase was students removing everything inside of the mini library so that other groups can proceesd with the renovations.

IMG-20190627-WA0005.jpg
Screenshot_20190627-230636_Instagram.jpg

Some of us were given the task to apply the first few coats of paints on the wall.

PHASE 2

Around 5 stdents did the floorings by covering it with epoxy.

IMG-20190627-WA0003.jpg
IMG-20190627-WA0004.jpg
IMG-20190608-WA0020.jpg
PHASE 3
IMG-20190627-WA0033.jpg

Lining up news paper before painting to prevent damaging the floors. 

Applying second coat of paint on the walls to cover completely the previous drawings behind the first coat.

IMG-20190627-WA0026.jpg
Screenshot_20190627-230506_Instagram.jpg
IMG-20190627-WA0028.jpg
IMG-20190627-WA0030.jpg

There were also a mural team that was lead by Azha with 3 other students including me.

IMG-20190627-WA0025.jpg

First we drew the images on the walls.

IMG-20190627-WA0027.jpg
IMG-20190627-WA0024.jpg

When we were done we mixed the colours to get the shades we wanted.

IMG-20190627-WA0023.jpg
IMG-20190627-WA0022.jpg

Then we started painting.

IMG-20190627-WA0014.jpg
IMG-20190627-WA0015.jpg

The final outcome of the mural

IMG-20190615-WA0018.jpg
IMG-20190615-WA0017.jpg
IMG-20190615-WA0019.jpg
IMG-20190615-WA0014.jpg
IMG-20190627-WA0017.jpg
IMG-20190627-WA0016.jpg
IMG-20190627-WA0013.jpg
IMG-20190627-WA0012.jpg
IMG-20190627-WA0011.jpg
IMG-20190627-WA0008.jpg
bottom of page